1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
Okx app download-APP, download it now, new users will receive a novice gift pack.
1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
OKX Wallet apk download latest version
author: 2025-02-01 03:43997.95MB
Check438.39MB
Check511.87MB
Check547.28MB
Check368.96MB
Check846.21MB
Check822.85MB
Check658.79MB
Check292.95MB
Check336.36MB
Check494.14MB
Check927.96MB
Check431.99MB
Check671.41MB
Check433.69MB
Check855.67MB
Check467.71MB
Check448.79MB
Check988.52MB
Check448.73MB
Check929.24MB
Check666.72MB
Check231.66MB
Check847.92MB
Check725.87MB
Check783.27MB
Check825.76MB
Check328.18MB
Check527.66MB
Check463.61MB
Check779.77MB
Check287.15MB
Check815.58MB
Check625.25MB
Check453.34MB
Check181.71MB
CheckScan to install
Okx app download to discover more
Netizen comments More
2914 口是心苗网
2025-02-01 04:18 recommend
1137 明明赫赫网
2025-02-01 03:07 recommend
645 冬烘先生网
2025-02-01 02:23 recommend
2982 竭诚相待网
2025-02-01 02:12 recommend
2471 无情无绪网
2025-02-01 02:02 recommend